Igoudar

Operations

Organise interventions and know the condition of every piece of equipment.

Maintenance, inspections, programming, roads, energy and field inspection: the work of technical services on inventory assets.

Modules in this family

Maintenance
Requires the inventory. Requests, work orders, preventive maintenance, contractors and bookings.
Condition and inspections
Requires the inventory.
Programming
Requires condition and inspections.
Linear roads
Requires the inventory.
Energy and lighting
Requires the inventory.
Field inspection
No prerequisite. Links to the legal register and occupancies.
Preventive maintenance and regulatory inspections: maintenance plans for street lights, electrical installations, irrigation network and road surface.
Screen detail, French interface · demonstration environment, fictitious data · October 2026

Maintenance

Interventions tracked from request to closure

The situation

Requests come in by phone, by letter or in person. Nobody knows who is on the job, with what equipment, or what it cost.

In Igoudar

  • A request concerns a room, a piece of equipment or a space. The server suggests nearby duplicates.
  • The work order is planned by team, according to workload and available equipment.
  • On their phone, the technician records time spent, checks, photos and signature.
  • The cost of the work order is charged to the assets concerned, including stores supplies when the stores module is active.
  • Preventive plans create work orders in advance, by calendar or by meter. Overdue regulatory inspections are flagged.

For the authority

Every intervention has its history and its cost.

List of work orders with their status: in progress, suspended, to be planned.
Screen detail, French interface · demonstration environment, fictitious data · October 2026

Condition and inspections

An official condition for each asset, dated and justified

The situation

The condition of equipment is known from memory and rarely written down. It is hard to defend a maintenance budget without evidence.

In Igoudar

  • Inspections follow grids published per asset class. The condition score is calculated by the server.
  • In the field, the inspection is done on the phone, with the position and photos frozen once submitted.
  • An urgent observation opens an intervention request when maintenance is active.
  • Approved deterioration curves estimate the remaining service life. Without a known age, no estimate is produced.

For the authority

A known condition for each asset, which can be shown to the council.

Asset condition: number of assets in very good, good, fair, poor and very poor condition.
Screen detail, French interface · demonstration environment, fictitious data · October 2026

Programming

Renewal choices backed by reasons

The situation

Choosing what to renew, and when, often depends on the emergency of the day.

For the authority

A multi-year programme in which every line has its justification.

In Igoudar

  • Decision support assesses risks and values from sourced data, then compares investment scenarios.
  • The renewal programme prepares the next five financial years from a selected scenario. Each operation is decided individually.
  • Annual sheets are frozen by another person and exported to prepare the budget. They are not an authorisation to spend.

Linear roads

Roads known section by section

The situation

A road is described by sections, not by points. Measurements and works along a road get lost.

For the authority

Dated measures, located on each road.

In Igoudar

  • A route is referenced from the asset’s alignment. Its length is measured.
  • Dated measures of published attributes are placed by kilometre point.
  • After a new reference alignment, positions are recalibrated and must be checked.

Energy and lighting

Consumption tracked building by building

The situation

Water and electricity bills arrive with no link to buildings. A drift goes unnoticed.

In Igoudar

  • Each meter is attached to an asset, with its utility and unit. Readings can also be entered on the phone.
  • Monthly consumption is compared by building, and public lighting by cabinet.
  • Drift and invoice-gap alert thresholds apply once approved by a second person.
  • With revenue and occupancies, consumption can be recharged to the occupant when their contract provides for it.

For the authority

Drifts identified and linked to the right building.

List of electricity and water meters, with the asset concerned.
Screen detail, French interface · demonstration environment, fictitious data · October 2026

Field inspection

Dated, located findings

The situation

Field findings are taken on paper, without dated photos or positions.

For the authority

Findings linked to the assets and rights concerned, with their follow-up.

In Igoudar

  • Staff follow inspection rounds over a zone. Each finding carries the actual position, accuracy and time.
  • Photos are frozen with their date and position.
  • A non-compliance opens a follow-up for the manager. With occupancies, an untitled occupancy can be recorded.

See your technical services in Igoudar

Choose a department and a type of equipment. We show the path of a request through to closure.

Request a demo